Location Baldwin Park, CA Size 1.5 MM sf Construction Value $5MM + Scope BAS Design support, Master Systems Integration, Performance Driven Analytics Project Highlights 5 year master planned upgrade and renovation, 1+ MM sqft High-paced after- hours controls turnover of complex surgery and specialty rooms Success leveraging analytics during turnover Kaiser [...]
Kaiser Permanente Enterprise Automation Strategy
Jeff Berge2023-11-06T16:57:29+00:00Location Nationwide Size Pilot: 10 sites Scope Integrating all Smart Building systems into the Niagara environment, including HVAC, DC lighting, UPS, energy metering, refrigerator monitoring, DHW, and fire life safety systems. Deployment of standardized advanced optimization control routines across the portfolio, ensuring high levels of energy efficiency that can be repeated and maintained in-house. Project [...]
Texas Medical Center | TMC3
Jeff Berge2023-11-03T22:52:02+00:00Location Houston, TX Size 250,000 sq. ft. Scope Master Systems Planner Texas Medical Center | TMC3 Altura is leading the design and implementation of Texas Medical Center's TMC3 Innovation Center. Altura and TMC staff collaboratively defined what it means for TMC to have a high performance Connected Building. Including elements of strategic [...]
Kaiser Permanente Hesperia MOB
Jeff Berge2023-11-03T22:31:14+00:00Location Hesperia, CA Size 54,000 sq. ft., 3 floors Scope $38 Million Construction Costs Patient exam rooms, offices, isolation rooms Project Highlights Asset data commissioning was also included to ensure effective handover of assets from design and construction to the maintenance management system for the building. Kaiser Permanente Hesperia Medical Office Building [...]