Caltech Chen Neuroscience Building: 30% Energy Savings

2025-10-30T16:27:24+00:00

  Location Pasadena, CA Size 150,000 sq. ft. Construction Value $193 million Building & Lab Types: Wet Labs, Office Space, Vivarium, Five floors (three above ground, two below) Project Highlight This state-of-the-art lab consumes nearly 30% less energy than a typical lab building on campus. Chen Neuroscience Research Building at Caltech Altura [...]

Kaiser Baldwin Park: Hospital Master Systems Integration

2025-10-30T16:29:59+00:00

  Location Baldwin Park, CA Size 1.5 MM sf Construction Value $5MM + Scope BAS Design support, Master Systems Integration, Performance Driven Analytics Project Highlights 5 year master planned upgrade and renovation, 1+ MM sqft High-paced after- hours controls turnover of complex surgery and specialty rooms Success leveraging analytics during turnover Kaiser [...]

Kaiser Permanente: Enterprise Automation Strategy

2025-10-30T16:30:17+00:00

  Location Nationwide Size Pilot: 10 sites Scope Integrating all Smart Building systems into the Niagara environment, including HVAC, DC lighting, UPS, energy metering, refrigerator monitoring, DHW, and fire life safety systems. Deployment of standardized advanced optimization control routines across the portfolio, ensuring high levels of energy efficiency that can be repeated and maintained in-house. Project [...]

Texas Medical Center TMC3: State-of-the-Art Commissioning

2025-10-30T16:50:48+00:00

  Location Houston, TX Size 250,000 sq. ft. Scope Master Systems Planner Texas Medical Center | TMC3 Altura is leading the design and implementation of Texas Medical Center's TMC3 Innovation Center. Altura and TMC staff collaboratively defined what it means for TMC to have a high performance Connected Building. Including elements of strategic [...]

Go to Top